![](/images/icons-large/icon-archival.png)
Showing 281 results
Archival descriptionFreshwater HT Circulating Pump Foundations
AU WA S2742 cons7053 E2.02
Main Engine Shop Trial Results - Preliminary
AU WA S2742 cons7053 E2.04
Noise/Vibration Measurements - Main Engine
AU WA S2742 cons7053 E2.08
Monorails and Lifting Lugs
AU WA S2742 cons7053 E2.10
Thermal Oil Boiler Foundation
AU WA S2742 cons7053 E2.16
General Arrangement of Emergency Generator
AU WA S2742 cons7053 EL1.04
Switchboard Paint Schedule
AU WA S2742 cons7053 EL1.06
Workshop Layout - Preliminary
AU WA S2742 cons7053 E2.12
Emergency Air Compressor Foundation
AU WA S2742 cons7053 E2.06
Bearing Repeater Pedestal
AU WA S2742 cons7053 H5.47
Freshwater Cooling System
AU WA S2742 cons7053 P1.08
M.V. Pilbara - capacity plan / as fitted general arrangement after minor conv...
AU WA S2742 cons5479 1
Cargo Hold Trunking - Supply
AU WA S2742 cons7053 H5.41
M.V Kimberley - plans - Burmeister and Wain's.
AU WA S2742 cons5482 07
Fuel Oil Separator Module
AU WA S2742 cons7053 E1.05
Details of Small Hatches
AU WA S2742 cons7053 H2.08
Details of Manholes
AU WA S2742 cons7053 H2.09
Aft End Sections 1
AU WA S2742 cons7053 H1.15
Arrangement of Manhole Covers
AU WA S2742 cons7053 H2.01
Heavy Fuel Oil and Diesel Oil System
AU WA S2742 cons7053 P1.11
Heat Balance Thermal Oil System
AU WA S2742 cons7053 P1.02
Emergency Generator Service Tank
AU WA S2742 cons7053 P2.1
Strainer Box
AU WA S2742 cons7053 P1.19
Ladders and Handrails (4/5)
AU WA S2742 cons7053 H2.12
Radar Masts
AU WA S2742 cons7053 H2.20